{"id":26837,"date":"2022-04-15T11:16:03","date_gmt":"2022-04-15T11:16:03","guid":{"rendered":"http:\/\/actualizateiguazu.com\/v3\/?p=26837"},"modified":"2022-04-15T11:19:31","modified_gmt":"2022-04-15T11:19:31","slug":"puente-presidente-franco-foz-de-iguazu-a-menos-de-200-metros-de-unirse","status":"publish","type":"post","link":"https:\/\/actualizateiguazu.com\/v3\/2022\/04\/15\/puente-presidente-franco-foz-de-iguazu-a-menos-de-200-metros-de-unirse\/","title":{"rendered":"Puente Presidente Franco \u2013 Foz de Iguaz\u00fa, a menos de 200 metros de unirse"},"content":{"rendered":"\n<p class=\"wp-block-paragraph\">La construcci\u00f3n del puente de integraci\u00f3n entre Brasil y Paraguay alcanza el 81 % de ejecuci\u00f3n y con los trabajos realizados esta semana, quedan 172 metros para la uni\u00f3n de la estructura.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">La Direcci\u00f3n de Coordinaci\u00f3n de Itaip\u00fa inform\u00f3 sobre la colocaci\u00f3n de la d\u00e9cima dovela met\u00e1lica en el lado paraguayo y de la duod\u00e9mica en el sector brasile\u00f1o, con lo que restan 172 metros para la uni\u00f3n del tramo principal del puente de integraci\u00f3n, con lo que se completar\u00e1n los 470 metros de vano central.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">En total se instalar\u00e1n 36 dovelas, 18 en cada margen, para formar la calzada. Cada pieza prefabricada pesa 95 toneladas y mide 11.90 metros de largo y 19.90 de ancho.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Con las tareas realizadas esta semana, el avance es del 81 % en relaci\u00f3n a octubre del 2021, mes de inicio de los trabajos.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Paralelamente se construyen las defensas tipo New Jersey y las veredas. Adem\u00e1s preparan la instalaci\u00f3n de tubos para el desag\u00fce pluvial.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">El puente que unir\u00e1 Presidente Franco y Foz de Iguaz\u00fa tendr\u00e1 760 metros de largo, con un vano central de 470 metros y una altura superior a los 60 metros. La obra es financiada por la Itaip\u00fa Binacional, con una inversi\u00f3n de 84 millones de d\u00f3lares.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Foto: gentileza Frankul 2018<\/p>\n","protected":false},"excerpt":{"rendered":"<p>La construcci\u00f3n del puente de integraci\u00f3n entre Brasil y Paraguay alcanza el 81 % de<\/p>\n","protected":false},"author":1,"featured_media":26838,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[1,224,225],"tags":[],"class_list":["post-26837","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-actualidad","category-el-mundo","category-internacionales"],"_links":{"self":[{"href":"https:\/\/actualizateiguazu.com\/v3\/wp-json\/wp\/v2\/posts\/26837","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/actualizateiguazu.com\/v3\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/actualizateiguazu.com\/v3\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/actualizateiguazu.com\/v3\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/actualizateiguazu.com\/v3\/wp-json\/wp\/v2\/comments?post=26837"}],"version-history":[{"count":2,"href":"https:\/\/actualizateiguazu.com\/v3\/wp-json\/wp\/v2\/posts\/26837\/revisions"}],"predecessor-version":[{"id":26840,"href":"https:\/\/actualizateiguazu.com\/v3\/wp-json\/wp\/v2\/posts\/26837\/revisions\/26840"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/actualizateiguazu.com\/v3\/wp-json\/wp\/v2\/media\/26838"}],"wp:attachment":[{"href":"https:\/\/actualizateiguazu.com\/v3\/wp-json\/wp\/v2\/media?parent=26837"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/actualizateiguazu.com\/v3\/wp-json\/wp\/v2\/categories?post=26837"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/actualizateiguazu.com\/v3\/wp-json\/wp\/v2\/tags?post=26837"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}